Skip to content
About

Accountability that does not stop at a scope boundary.

Saif Noman Electric designs, builds, commissions and maintains industrial electrical installations from one workshop in Mosul. The disciplines usually split between subcontractors sit with a single team here.

An industrial electrical installation is rarely delivered by one party. The panel builder, the controls engineer, the generator supplier and the maintenance contractor each hold part of it. Every boundary between them is a point where responsibility changes hands.

We hold all six disciplines. The drawing, the assembly, the commissioning record and the service contract stay with the same team, in the same city.

Base
Mosul, Nineveh, Iraq
Disciplines
6
Hours
Sun–Thu 08:00–17:00
Why one contractor

Faults get argued at the boundaries.

Every handover in a split scope is a place where a fault can be discussed instead of fixed. A single contract removes the boundaries rather than managing them.

Split scope
Design
handover Build
handover Install
handover Commission
handover Maintain
One contract
Design
Build
Install
Commission
Maintain
Five phases of the same installation. Above: four handovers between parties. Below: none.
What that means

Three things stay together.

The designers commission it

The team that draws the installation is the team that energises it and signs it over.

Maintenance is in the same contract

Scheduled and corrective servicing is written into the build, not tendered separately afterwards.

Panels are built in Mosul

Assemblies are wired and tested in our own workshop before they reach site.

Standards

What the work is built to.

Two international standards govern most of what we assemble and program.

IEC 61439-2

Low-voltage switchgear and controlgear assemblies

Power switchgear and controlgear assemblies. Panels are built and verified to this part.

IEC 61131-3

Programmable controllers — programming languages

Control logic and HMI work is written to this part.

Ratings

Generators
Up to 1 MVA
Motors
LV three-phase
Solar energy
On / off grid

These are the standards the work is built and tested to.

A line is down.

Call the workshop directly.

+964 777 400 8300